Our involvement focused on a highly specialised component of the construction works: developing a safe and practical methodology for the removal of the existing escalators within a constrained existing structure, while supporting the builder through construction planning, stakeholder engagement and delivery.
Project Overview
Balance Consult was engaged by Bldg.Eng to provide specialist structural engineering services during the refurbishment of the street-level lobby at 55 Collins Street, a 46-storey commercial office tower within Melbourne's Collins Place precinct. The project formed part of a broader initiative to modernise the lobby environment and create additional leasable commercial space through the removal of existing escalators.
Our involvement focused on a highly specialised component of the construction works: developing a safe and practical methodology for the removal of the existing escalators within a constrained existing structure, while supporting the builder through construction planning, stakeholder engagement and delivery.
Our Appointment
Balance Consult was engaged directly by the builder, Bldg.Eng, to provide structural engineering services that could not be obtained through the incumbent project consultants. We worked closely with the contractor throughout the construction phase, assisting with structural investigations, methodology development, design documentation and construction-stage support.
Our role included reviewing original structural documentation, reverse engineering the existing structure to establish available capacity, developing temporary structural works and construction methodologies, preparing supporting documentation, and providing certification for the proposed design and staging approach. We also participated in stakeholder workshops and technical reviews with the building owner, Mirvac, to support approval of the proposed construction methodology.
Our appointment was limited to specialist structural engineering services associated with the escalator removal and related construction activities.
Key Challenges
Working within an existing high-rise commercial building presented a series of structural and construction constraints.
The existing floor structure offered limited available capacity for the heavy plant and equipment required to undertake the demolition works. In addition, the weight and configuration of the existing escalator structures were not fully known, requiring careful assessment and engineering judgement before demolition could proceed safely.
The project also involved significant spatial constraints. Any temporary works solution needed to function within the limitations of the existing structure, accommodate staged demolition activities, and avoid permanent impacts to the building fabric. Much of the work was also required to occur outside normal operating hours, adding further complexity to planning and execution.
Engineering Solution
To address these challenges, Balance Consult carried out a detailed assessment of the existing structure using available drawings and modern analysis techniques to establish the capacity available for demolition and construction activities. Alternative approaches were considered, including greater reliance on mobile plant and equipment, strengthening of existing structural elements and other methodology variations.
The adopted solution centred on the design of a temporary overhead rigging gantry capable of being erected within the constraints of the existing building structure. The gantry was developed to facilitate the controlled removal and hand-off of heavy escalator components while minimising demands on the surrounding structure and avoiding permanent modification to the building.
Balance Consult documented the structural framing and staged construction requirements, incorporated construction methodology requirements into the design documentation, and provided certification of the design, staging and methodology. Throughout construction, we worked closely with the builder and project stakeholders to assist in navigating health, safety and methodology approval processes.
A significant part of our contribution involved translating technical engineering considerations into language that could be readily understood by asset owner representatives and project stakeholders, helping build confidence in the proposed methodology and facilitating acceptance of the construction approach.
Project Outcomes
The specialist engineering services provided by Balance Consult enabled the safe removal of the existing escalators and facilitated access to a critical work area within the refurbishment programme. The methodology developed for the works allowed demolition activities to proceed within the project's required timeframe and helped unlock subsequent stages of the redevelopment.
Our involvement assisted in reducing construction risk associated with the demolition works, supported stakeholder acceptance of the proposed methodology, and provided the builder with the technical confidence required to deliver a complex element of the project safely and efficiently.
The completed refurbishment delivered a renewed lobby environment and created additional commercial space within one of Melbourne's landmark office buildings, contributing to the ongoing appeal and functionality of the asset.
Project Stats
Collins Place Lobby Refurbishment, 55 Collins St Melbourne
Melbourne CBD, Victoria
Commercial
Bldg.Eng
Mirvac
Confidential
Specialist Structural Engineering Consultant
Structural assessment, reverse engineering, temporary works design, construction methodology
Complete
July 2025 - August 2025
Structural steel, existing concrete, temporary works, safe construction methodologies