Ss Michael and Johns STEAM and Learning Hub Expansion

The works include approximately 900m² of new and refurbished learning spaces associated with the existing school building, a 450m² new building, and approximately 450m² of external works. The project commenced in February 2025 and is currently nearing completion, with the new facilities planned for use in the 2027 school year.

Project Overview

Ss Michael and John's Primary School is an education redevelopment project in Horsham, Victoria, being delivered for Melbourne Archdiocese Catholic Schools (MACS). The project is designed to expand and enhance the school's learning environment through the extension of the existing main building, the delivery of a new Science, Technology, Engineering, Arts and Mathematics (STEAM) facility, and upgrades to external student spaces.

The works include approximately 900m² of new and refurbished learning spaces associated with the existing school building, a 450m² new building, and approximately 450m² of external works. The project commenced in February 2025 and is currently nearing completion, with the new facilities planned for use in the 2027 school year.

Our Appointment

Balance Consult was engaged by Morton + Co Architects, acting as lead consultant for the project, to provide both structural and civil engineering services across the design and construction phases. Our appointment included concept design, detailed design, documentation and construction-phase support.

As part of the broader consultant team, we were responsible for the structural design of the new building, modifications and extensions to the existing school facilities, and civil engineering associated with stormwater drainage and site grading works. Our services included preparation of engineering documentation, certification, construction-phase services, and coordination with the architect and building services consultants throughout project delivery.

Project Challenges

A significant project consideration was the need to deliver new facilities within an operational school environment. Existing school buildings were required to remain functional throughout the works, with careful attention given to maintaining student safety and minimising disruption to ongoing school operations.

The extension and modification of the existing buildings also required careful engineering assessment and design. Balance Consult undertook a desktop review of historic structural and civil engineering information prepared by others to understand existing conditions and inform the design approach.

From a civil engineering perspective, the project required coordination with existing underground infrastructure, management of surface grading, and integration of new drainage systems within an established school site. Existing boundary levels, building floor levels and site constraints all influenced the final design solution. Existing surface fill also required consideration during foundation design.

The new STEAM building introduced additional structural requirements. Its articulated façade and external brick cladding required specific structural design measures to ensure the masonry was appropriately supported and restrained. At the same time, the school's brief prioritised large, flexible learning environments with minimal internal columns, requiring careful consideration of structural spans and framing arrangements.

Engineering Solution

To address these challenges, Balance Consult carried out a detailed assessment of the existing structure using available drawings and modern analysis techniques to establish the capacity available for demolition and construction activities. Alternative approaches were considered, including greater reliance on mobile plant and equipment, strengthening of existing structural elements and other methodology variations.

The adopted solution centred on the design of a temporary overhead rigging gantry capable of being erected within the constraints of the existing building structure. The gantry was developed to facilitate the controlled removal and hand-off of heavy escalator components while minimising demands on the surrounding structure and avoiding permanent modification to the building.

Balance Consult documented the structural framing and staged construction requirements, incorporated construction methodology requirements into the design documentation, and provided certification of the design, staging and methodology. Throughout construction, we worked closely with the builder and project stakeholders to assist in navigating health, safety and methodology approval processes.

A significant part of our contribution involved translating technical engineering considerations into language that could be readily understood by asset owner representatives and project stakeholders, helping build confidence in the proposed methodology and facilitating acceptance of the construction approach.

Project Outcomes

Balance Consult's involvement helped facilitate the successful delivery of new educational facilities while maintaining the operation and safety of the existing school throughout construction. The engineering design enabled modifications to the existing buildings with reduced risk and provided a practical framework for staged construction on an active education site.

The completed works will provide expanded learning environments, improved external student facilities and a new STEAM building that will serve as a prominent addition to the school's Horsham campus. The project demonstrates Balance Consult's ability to integrate structural and civil engineering services within operational education environments, while balancing new construction, adaptive re-use and site-wide infrastructure requirements.

Engineering Solutions

Balance Consult provided integrated structural and civil engineering services to support both the new build and refurbishment components of the project. Structurally, our work included the design of the new STEAM facility together with modifications and extensions to the existing school buildings. Civil engineering services included stormwater drainage design, coordination of underground infrastructure, and development of site grading strategies that responded to existing conditions.

The structural solution incorporated steel framing systems capable of delivering the large-span learning spaces sought by the school while supporting the architectural objectives of the project. Particular attention was given to the interface between the new extension works and the existing buildings, ensuring modifications could be undertaken safely and practically within the live school environment.

Our engineering approach also considered project staging requirements, allowing building works to be delivered in a manner that responded to site constraints and ongoing school activities. The design incorporated appropriate contingencies to address potential differences between documented and existing site conditions, reducing risk during construction and modification works.

Project Stats

Ss Michael and Johns Primary School

Horsham, Victoria

Education

Morton + Co Architects

Melbourne Archdiocese Catholic Schools (MACS)

Approximately $4.1 million

Structural and Civil Engineering

Structural design, civil design, documentation, certification and construction-phase services

Under Construction

February 2025 to Present

Structural steel framing, building modifications and extensions

Project |

Location |

Sector |

Client |

End Client |

Project Value |

Balance Consult Role |

Services |

Project Status |

Balance Consult Involvement |

Key Systems |

Previous
Previous

Richmond Football Club Punt Road Redevelopment

Next
Next

Collins Place Lobby Refurbishment